<code id="51q56"></code>

      <tr id="51q56"><nobr id="51q56"><delect id="51q56"></delect></nobr></tr>
      <code id="51q56"></code>

    1. <tr id="51q56"></tr>

      <tr id="51q56"></tr>

      • ADD£ºD-1701 VAN METROPOLISD 35 TANGYAN ROAD WEST HI-TECH DISTRICT XI¡®AN
      • TEL£º029-88328396
      • FAX£º029-88333844
      • E-mail£ºhxkiln@126.com
      Your present position£ºHome << News << Company news
      Commissioning of 90 m3 well kiln of Shanxi Zhongda Aluminum Industry Co. Ltd Succeeds With A Single Operation.
      Source: Author: Date£º2014-1-14 Clicks£º1179

        90m3 well kiln of Shanxi Zhongda aluminum industry co. ltd designed, constructed and contracted by our company commenced to construct in July 2013 ,and completed on 15 October 2013. It ignited to dry the kiln on 19 October 2013. The ignition and commissioning succeed with a single operation.
      Kiln load capacity:1400 pieces of §æ60 ceramic roller. Fuel consumption: 10000 m3 natural gas per kiln time.
        Kiln temperature, pressure, and flow volume are all automatically controlled. All technology indexes achieve the design requirement.

                                                                     Xian Hengxin kiln technology Co.Ltd

                                                                                10. January 2014 

       

       

      previous£ºInstallation and Commissioning of 17.5m Electric Heating Heat Treatment Furnace of Shanxi Yangmei Chemical Industry Machinery Co. Ltd Succeed
      next£ºNone

      Copyright£ºXI'AN HENGXIN KILN TECHNOLOGY CO., LTD. Shan ICP for 10200238

      ADD£ºD-1701 VAN METROPOLISD 35 TANGYAN ROAD WEST HI-TECH DISTRICT XI¡®AN TEL£º029-88328396 FAX£º029-88333844 Postcode£º710065

      Visit£º99778,You are 99778 visitor, thank you

      无码加勒比久久久,综合激情丁香久久狠狠,久久精品国产亚洲沈樵,2020精品久久只有精品